Experts in Building Environments™

Nortek Air Solutions News

Filter
Air Handler Upgrades

Video goes here   Do any of the following statements apply to your building’s HVAC system? Aging air handlers require added maintenance just to keep them running. A catastrophic fan failure in your air handler(s) could interrupt your building operations for days or longer. Changing facilityRead more

Case Study: Chicago Board of Trade

At a Glance Rising maintenance costs and the higher probability of an HVAC system failure provided ample support for replacing aging built up air handlers installed in 24th floor mechanical rooms. Access restrictions and uptime requirements eliminated options to fully replace the air handlers orRead more

Governair Delivers 100% Outdoor Air Solution at MIT

Laboratory/Office Case Study From Model T’s to High-Tech Research At a Glance Historic 240,000 sq. ft. Factory Building Converted to High-Tech Laboratory Spaces Entire Building Brought to Lab Standards with 100% Outdoor Air Four 90,000 cfm Governair Custom Air Handlers Supply Existing VAV System RunaroundRead more

Temtrol Provides Air Handler Solution for LEED Platinum Installation

Laboratory Case Study Encore Wire Sustainable R&D Center LEED Platinum Building Design with Energy Efficient HVAC System   At a Glance New 13,000 sq. ft. research and development center designed for LEED Platinum certification Small equipment room space required break apart air handler construction forRead more

Temtrol Introduces RAPID Knock-Down Air Handler

Okarche, OK (August 2, 2012)—Temtrol has introduced the RAPID Knock-Down air handler (RKD), an air handler designed to be delivered to the jobsite in sections matched to the building’s minimum opening, to allow for easier installation into tight or hard-to-reach spaces. This technology was pioneered byRead more